The aim of this application is to provide reliable, real-time information on whether a highly renewable European mix could work with actual electricity demand across Europe. This page sets out the purpose of the project and the different scenarios.
1. Purpose of the project
In short. To show, with figures to back it up, how Europe could produce its electricity without fossil fuels, so that the debate can rest on facts rather than impressions.
Technical details
The public debate on electricity often pits sweeping claims against each other: “the wind doesn’t always blow”,
“renewables are enough”, “nuclear is indispensable”. They are rarely tested against concrete orders of
magnitude. ENRgy Maps aims to improve the quality of this debate by showing, hour by hour and with actual weather
and demand, what a highly renewable European power fleet would deliver: when it is enough, when it
falls short, what it costs, and what storage, cross-border exchanges and nuclear change.
The idea is to picture a possible future rather than to guess it: each scenario is explicit, and its
assumptions and limitations are published so that they can be discussed, challenged and improved. They are neither forecasts nor
recommendations, but shared reference points for reasoning together.
2. The published scenarios
In short. Three European power fleets, computed on 2025 weather and demand: today's fleet, a fossil-free fleet that keeps today's nuclear, and a 100% renewable fleet with no nuclear. The table compares their cost, their emissions and the backup turbines added by the stress test. The fleets sized for 2050 demand are presented separately (section 3 ter).
Technical details
Current fleet 2025: today's power plants, fossil included. Renewables + current nuclear: no fossil coal,
lignite, gas or oil; the existing nuclear fleet is kept and the rest is built at least cost (solar, wind, batteries, biogas),
with no imposed renewables share. 100% renewable: no fossil and no nuclear, all of the year's generation is renewable.
Both fossil-free fleets are reinforced by the stress test (section 3 bis).
Scenario
Renewables share (year)
Total cost €bn/yr 2026-2028 gas
Total cost €bn/yr 2025 gas
Life-cycle CO₂ MtCO₂e/yr
Direct CO₂ MtCO₂/yr
Backup turbines GW
Curtailment TWh
Biogas burned TWhth
Nuclear TWh
Annualised costs, including the stress-test backup turbines, at the average 2026-2028 gas price (€61.3/MWh_th)
and, as a sensitivity, at the 2025 gas price used in the run (€36/MWh_th). Life-cycle emissions: generation of each
technology × the site's factors (section 7). Detailed comparison, charts and cost per tonne of CO₂ avoided: Observatory.
3. How the fleets are calculated
In short. Modelling software chooses the cheapest power plants, wind turbines, solar panels and batteries to meet demand over the whole of 2025, with its actual weather and the current grid between countries.
Technical details
Model
PyPSA-Eur v2026.09.0, electricity only, 47 European bidding zones (one node per zone), computed on
an OVH machine. Linear optimisation of investment and operation over a full year.
Weather year
2025 (wind and sun from ERA5/SARAH-3 via atlite), 2025 demand. A single year: a less
windy year would cost more.
Resolution
Year split into 1,500 segments of variable length (3 to 6 per day) that follow day and night.
Starting fleet
Existing fleet (coal, gas, oil, biomass, hydro, renewables); base A: without nuclear.
The optimisation can close existing thermal plants and build solar, onshore and offshore wind, batteries and gas.
Imposed renewables share
Only the 100% renewable scenario imposes a renewables share: 100% of the year's generation, with
neither fossil fuels nor nuclear. It relies on biogas burned in gas-fired power plants (about 254 TWhth in 2025), within the limits of national
potentials (338 TWhth a year for all countries combined), at a price of 100 €/MWhth. The zero-fossil scenario forbids
fossil fuels and keeps existing nuclear, with no imposed renewables share: it reaches 79% at least cost.
Grid
Current grid between zones held fixed, with no expansion projects; exchanges capped by the commercial capacities
(NTC) published by ENTSO-E for 2026, in each direction. Extra cost of internal reinforcement for solar and onshore wind
counted at 100 €/kW (range 80 to 120 €/kW) in all three scenarios.
Costs
Annualised investment (technology-data v0.15.0, 2030 costs, 7% rate), fixed and variable costs, CO₂ at 78.59 €/tCO₂ (EU ETS average over the last 12 months as of October 2026). Fossil gas at the 2026-2028 average price (€61.3/MWh_th: TTF 2026, EEX 2027 and 2028 futures), as in Discover mode: the capacity expansion, run at the 2025 price (€36/MWh_th), is adjusted with unchanged dispatch (+€25.3/MWh_th × fossil gas burned, biogas excluded); the 2025 price is kept as a sensitivity.
Total costs include a constant (existing fleet, grid, hydro): only the differences between scenarios are meaningful.
Computation
Each scenario is computed on its own from the existing fleet.
Solver tolerance: 10-5 on the gap between the bounds of the optimal cost.
3 bis. Stress test on difficult years (zero blackout)
In short. A fleet sized on 2025 weather alone may run short in harsher winters. It is therefore replayed on past weather years; the days when part of the demand would not have been served are identified, and whatever is needed to get through those days without load shedding is added at least cost.
Technical details
Replay
The sized fleet is frozen, then replayed hour by hour on the weather and demand (rescaled to the 2025 level) of other years. October 2026 run: 2016 to 2025. November 2026 run: first the most stressed years (2017, 2022, 2024) and 2025, then all ten years.
Stress windows
Each day with load shedding gives a window from 3 days before to 2 days after; overlapping windows are merged. November run: 30 windows for the 100% renewable fleet and 32 for the zero-fossil fleet (years 2017, 2022, 2024 and 2025).
Reinforcement
On each window, load shedding is forbidden and the model adds biogas turbines at least cost (annualised cost of a combustion turbine), keeping the rest of the fleet. A variant reinforcing the links between countries instead is computed for comparison. The turbines kept per zone are the maximum over all windows.
Result
November 2026 run: 100% renewable fleet, +50.0 GW of biogas turbines (France 14.5 GW, Spain 9.4, Poland 5.3, Germany-Luxembourg 2.9…); zero-fossil fleet (renewables + current nuclear), +71.8 GW (Spain 12.9 GW, France 10.1, Germany-Luxembourg 8.4, Portugal 7.3…). These reinforced fleets are the ones used by the simulator. The turbines run few hours a year; their cost (€60.24/kW/yr, i.e. €3.0bn and €4.3bn a year) is added to the fleet cost.
Limitations
Guarantee limited to the replayed years; past demand rescaled to today's level; no random outages and no grid stability.
3 ter. 2050 horizon: tomorrow's demand
In short. The same questions, with the electricity demand expected in 2050: about 4,800 TWh a year for the modelled Europe, against 3,008 today, because heating, cars and part of industry switch to electricity. A first 100% renewable fleet is computed for this demand, reinforced by the stress test and checked on ten years of weather. The fleets with nuclear have been sized too; their result and the status of their stress test are given below. A variant with more flexible demand is still being computed. Their costs cannot be compared with today's: the demand is not the same.
Technical details
Scenario 2050 demand
RES share (year)
Total cost €bn/yr
Life-cycle CO₂ MtCO₂e/yr
Direct CO₂ MtCO₂/yr
Backup turbines GW
Demand TWh/yr
Zero load shedding
Loading…
Renewables + current nuclear Zero fossil, today's nuclear kept
88% renewable · €428bn/yr (incl. +91.1 GW of backup turbines) · 150 MtCO₂e/yr life-cycle · 575 TWh of nuclear. Stress test in progress no load shedding in 2016-2019 and 2022-2024; 2020 and 2021 (8 hours, 15 and 85 GWh) under additional reinforcement; 2025 being checked.
Renewables + new nuclear Zero fossil; the model may build reactors
Same fleet as above: with 2050 demand too, the model builds no new reactor (same cost, €423bn/yr excluding backup turbines, same nuclear output).
100% renewable, flexible demand Same demand, more flexible (see below)
Computation in progress capacity expansion in progress
Annualised costs of the whole power system, backup turbines included, 2050 technology costs. They cover a demand of 4,815 TWh a year: they cannot be compared with the costs in section 2, computed for 3,008 TWh. Life-cycle CO₂: output of each technology × the site's factors (section 7), imported molecules not counted.
2050 demand by use
France: RTE, Futurs énergétiques 2050 (2022), reference trajectory, 645 TWh (electric heating 47.5 TWh, road transport +80.7 TWh for about 36 million electric vehicles, industry +67.1 TWh, electrolysis 50 TWh, rail +4.9 TWh). Other countries: TYNDP 2024 (ENTSO-E and ENTSOG), Distributed Energy 2050 scenario: total consumption and seasonality of each country. Every hour the demand is rebuilt: today's uses excluding heating, scaled to the 2050 level, plus 2050 heating, electric-vehicle charging and the increases in industry and other uses (flat). Total for the modelled Europe: 4,815 TWh on the 2025 weather year.
Heating
The temperature-dependent share of today's demand is estimated by regression on degree-days (base 15 °C), then replaced by 2050 heat-pump heating: its energy follows the degree-days of the year (reference: Eurostat 2016-2025 average), its hourly shape follows heat demand and the hour-by-hour efficiency of an air-to-water heat pump (Staffell et al., 2012, as in PyPSA-Eur).
Electric vehicles
PyPSA-Eur model: 11 kW chargers, 50 kWh batteries, weekly traffic profile. Labelled assumption: smart (controlled) charging for half of the vehicles (PyPSA-Eur default), battery at least 80% charged at 7 am. The fleet is not resized for smarter charging (vehicle-to-grid, little-used vehicles): that is what the flexible variant is for.
Hydrogen and e-fuels
Hydrogen demand from industry and steel (TYNDP 2024) and regulatory minimums for e-fuels (ReFuelEU Aviation: 35% in 2050; FuelEU Maritime: 2% synthetic fuels), country by country. Each molecule can be produced in Europe (electrolysis; synthesis with CO₂ captured at €250/t) or imported: hydrogen at €100/MWh, e-kerosene at €170/MWh, e-methanol at €150/MWh (delivered in Europe, upper range of the studies: Dunkel et al. 2025, Neumann et al. 2025, EWI 2025, ICCT 2022, BNEF 2024). In the 100% renewable fleet, 540 TWh of hydrogen are imported (96%) and 22.6 TWh produced in Europe by 3.7 GW of electrolysis; e-kerosene (162 TWh) and e-methanol (12 TWh) are fully imported; 56.8 GW of hydrogen turbines produce 19 TWh at peak hours. Labelled assumption: imports are assumed green, counted at their import price and outside the power fleet (neither their production nor their emissions are counted). Electrolysis runs flat in this computation (not flexible).
Costs and biogas
2050 technology costs from technology-data (batteries: project values, €75/kWh and €120/kW). Biogas: supply curve in three tranches, today's potential at €100/MWhth, additional anaerobic digestion at the same price, then gasification, 29% more expensive (ENGIE, Biogas potential and costs in 2050, 2021). The 100% renewable fleet burns 418 TWhth a year.
2050 grid
TYNDP 2024 reference grid and decided projects, with at least today's exchange capacities in each direction; the model can also build, at their cost, the TYNDP 2024 candidate projects. The 100% renewable fleet builds 89 GW of them.
2050 stress test
Same procedure as in section 3 bis, with each year's 2050 demand (heating follows its weather): 65 stress windows over 2016-2025, +115.8 GW of biogas turbines (Germany-Luxembourg 33.9 GW, Great Britain 15.5, France 13.9, Finland 8.9…), i.e. €7.0bn/yr. Check on the ten years 2016-2025 with these turbines: at most 0.004 GWh unserved per year.
Fleets with nuclear
Renewables + current nuclear and renewables + new nuclear (the model may build reactors if they are cheaper): sized for 2050 demand. Result: both computations give the same fleet, the model builds no new reactor (575 TWh of nuclear, today's); 88% renewables, €428bn/yr with +91.1 GW of backup turbines. Stress test: no load shedding in 2016-2019 and 2022-2024; additional reinforcement in progress for 2020 and 2021. Stress test in progress
Flexible variant
The same demand, made more flexible by 37 parameters, each one sourced (data/demande_future/flexibilite_2050.csv, validated on 08/11/2026): smart charging for 70% of vehicles, 35% of little-used vehicles with no daily charging obligation, vehicle-to-grid for 20% of controlled vehicles, giving up a few trips, demand response, flexible electrolysis with hydrogen storage, controlled water heaters, heating shifted thanks to building inertia, stored industrial heat, data centres, refrigeration and air conditioning. Computation in progress
Daily simulator
With the 2050 horizon, recent days are replayed every day on the real weather with that day's 2050 demand, broken down by use (today's uses rescaled, heating, vehicle charging, industry, other increases).
Limitations
The minimum operation of biomass cogeneration plants, measured in 2024-2025, is still applied in 2050 (labelled assumption, to be removed in the next computation). A single demand trajectory (RTE and TYNDP 2024), a single weather year for sizing, imported molecules assumed green, flat electrolysis.
4. How the hour-by-hour simulation works
In short. Every day, the imaginary fleet, which no longer changes, is confronted with the real weather and real demand; the calculation chooses, hour by hour, which installations generate and what the countries exchange.
Technical details
Each scenario’s fleet is held fixed, then every day we compute, hour by hour, the cheapest generation that meets
demand, using the real weather forecasts and real demand. The fleet never changes during the simulation; only the levels
of storage (batteries, reservoirs, pumped hydro) carry over from one day to the next.
Layers
Forecast (the evening before: latest published IFS weather run, ENTSO-E forecast demand),
provisional (day completed: earliest lead times of the archived weather runs, measured demand), then consolidated (to come).
Dispatch costs
Fuel + CO₂ at the same price as in the capacity expansion. A given day’s renewables share is not imposed:
it follows from the fleet, the weather and the demand of that day.
Biogas
Burned in gas-fired power plants when needed, more in winter than in summer, with no daily limit.
It is the turbines (GW) of each country that set the limit. In the hour-by-hour simulation of past years, the
TWh are limited only at European level (sum of potentials, 338 TWhth a year): biomethane
travels through the gas network.
Nuclear (base B)
Availability month by month and by country (spring and summer outages, derived from actual nuclear
output 2023-2025), and the fleet always running at no less than 50% of available capacity, in the capacity expansion as
in the simulation.
Exchanges
Transport model between zones, capped by grid capacities; these are not physical flows.
Renewables share displayed
Renewable share of consumption: each import is counted with the mix of the zone
that sends it (proportional sharing of the simulated exchanges), so an import of renewable origin counts as
renewable. The generation breakdown, on the other hand, shows imports as they are, on a separate line.
Efficiencies, storage durations, water inflows and initial states are labelled assumptions (the simulator’s
“assumptions” button), pending a reading of the computed networks.
5. Limitations and contributions welcome
In short. These calculations simplify reality: here is what they do not yet take into account. Your comments are welcome.
Technical details
Extra cost of grid reinforcement estimated as a flat €100/kW; a single weather year for capacity expansion,
complemented by the stress test on difficult years; lightened solver settings.
Biogas: potential (338 TWhth a year) and price (100 €/MWhth) still to be refined.
Hydrogen allowed but barely installed by the optimisation: left out of the hour-by-hour simulation.
Static CO₂ price (78.59 €/tCO₂, EU ETS average over the last 12 months as of October 2026) and a single discount rate (7%).
6. Reading the simulator
In short. The map colours each zone by its share of renewable electricity, or of wind and solar, or by its carbon intensity. Tap a zone to see its hour-by-hour generation.
Technical details
Simulated fleet, neither a forecast nor a recommendation. The fleets are sized at least cost, then
simulated hour by hour on actual weather and demand; they are not measurements.
Maps: share of solar and wind, share of renewables (imports counted with the mix of their zone of origin, by
proportional sharing of the simulated exchanges) or carbon intensity of the electricity consumed (gCO₂e/kWh, life cycle).
Zone chart: the last 72 hours up to the chosen moment; dragging or clicking in the chart sets
the moment. Over a day, a month or a year, values are averages, computed over the available hours.
Keyboard: on the time slider, left and right arrows step by step, Page Up and Page Down for big
jumps, Home and End; on the map, arrows to move from one zone to another and Enter to open the details.
7. Costs and emissions by technology
In short. The cost and emission assumptions for each technology, for the most curious. Tap the title to expand the table.
Technical explanations
Technology
Investment €/kW
Fixed O&M % of invest./yr
Lifetime years
Variable cost €/MWh
Fuel €/MWhth
Efficiency
Direct emissions gCO₂/kWh
Life cycle gCO₂e/kWh
Solar (ground-mounted)
482
2.5%
40
≈ 0
—
—
0
48
Onshore wind
1,383
1.2%
30
1.8
—
—
0
11
Offshore winda
2,115
2.3%
30
≈ 0
—
—
0
12
Run-of-river hydrob
4,333
2.0%
80
0
—
90%
0
24
Reservoirs and pumped hydrob
2,889
1.0%
80
0
—
75% (round trip)
0
24
Batteriesc
75 €/kWh + 120 €/kW
0.34% (inverter)
25 / 10
0
—
96% (inverter)
0
n/a
Biomass
2,951
4.5%
30
6.1
17.33
26.9%
0 (biogenic)
230
Biogas, burned in gas-fired plantsd
—
—
—
—
100
41 to 58%
0 (biogenic)
11g
Gas, combined cycle (CCGT)
1,109
3.3%
25
5.6
36h
58%
341
490
Gas, turbine (OCGT)
581
1.8%
25
6.0
36h
41%
483
490
Coale
4,812
1.3%
40
4.1
12.39
35.6%
944
820
Lignitee
4,812
1.3%
40
4.1
7.94
33%
1,233
n/a
Oil
458
2.5%
25
8.0
43.63
35%
735
730
Nuclear (existing)e
10,806
1.3%
40
4.5
7.45
32.6%
0
12
Grid reinforcementf
100 (80 to 120)
—
40
—
—
—
—
—
Common to all technologies: 7% discount rate, CO₂ price 78.59 €/tCO₂ (EU ETS average over the last 12 months as of October 2026), extra grid cost for renewables (100 €/kW) counted in all three scenarios. Direct emissions = fuel intensity (tCO₂/MWhth) ÷ efficiency.
a Excluding grid connection, added according to distance from the coast. b Existing fleet, not expanded by the optimisation. c Provisional project values (decision of 14/10/2026, BNEF benchmark still to be sourced); technology-data (2030) gives 190 €/kWh and 214 €/kW. d Provisional price of 100 €/MWhth (technology-data: 78.81); no dedicated capacity, it is burned in gas-fired plants; carbon intensity: see note g. e Existing plants only: the optimisation pays only their fixed O&M and can close them. The life-cycle factor for coal (IPCC median for a typical plant) is lower than the direct emission calculated with the average efficiency of the existing fleet; no sourced life-cycle factor for lignite. f Order-of-magnitude figure taken from Ange Blanchard. g EU directive RED II (2018/2001), Annex VI: default value for electricity from manure biogas, 3 gCO₂e/MJ, i.e. 11 gCO₂e/kWh; avoided methane counted, biogenic CO₂ not counted. h Average 2025 TTF price, used by the computation; published costs are adjusted to the 2026-2028 average price (€61.3/MWhth), see section 3.
Sources: costs and efficiencies, technology-data v0.15.0, 2030 costs (costs.year: 2030; the PyPSA-Eur files keep the name costs_2025_processed.csv), except batteries, biogas, biomass, coal and gas (project choices, pypsa/custom_costs_paliers.csv); 2050 demand: 2050 costs (section 3 ter); life cycle, IPCC AR5, Annex III, medians (hydro: 24 gCO₂e/kWh adopted by the project), see backend/app/carbon/factors.yaml.
8. The role of biogas
In short. Used in electricity only to fill the gaps left by solar, wind and batteries, biogas secures variable renewable generation. It gives access to abundant, low-carbon, renewable and competitive electricity, which then serves to decarbonise the rest of the economy through electrification (replacing fossil fuels in transport, heating and industry with decarbonised electricity).
Technical explanations
Why biogas?
To build a very highly renewable power system at least cost, a dispatchable source is needed for the
periods without wind or sun that batteries do not cover, especially in winter. Biogas burnt in gas plants plays this role: without
it, much more solar, wind and storage would be needed, and they would be little used.
Significant quantities
The 100% renewable scenario burns about 254 TWhth a year, three quarters of the potential used (338 TWhth,
livestock manure and sewage sludge). It is the first resource whose limit is approached, well before land for solar or wind.
The closer this cap, the more expensive the last renewable MWh: solar, wind and storage
then have to be oversized.
A larger potential in 2050
Gas for Climate and Guidehouse (2022, 2024) estimate Europe's anaerobic digestion potential at about
1,000 TWh a year in 2050 (sequential crops, agricultural residues, manure), without dedicated energy crops, plus wood gasification.
A variant of the 100% sizing with 1,000 TWhth is being computed.
A coveted resource
Other sectors will want this biogas: industry, heat, transport. The project's logic is therefore to
electrify energy demand as much as possible (no biogas for transport, industry electrified as far as possible) and to keep biogas
for what electricity cannot do.
CO₂ emissions
The CO₂ leaving the stack is real (about 340 g/kWh in a combined cycle), but it comes from carbon captured by
plants: it is not counted, as provided by the EU directive RED II. For carbon intensity, the simulator uses the RED II default value for
electricity from manure biogas: 11 gCO₂e/kWh over the life cycle (including avoided manure methane; RED II range: from -338 g for
manure with covered digestate to +212 g for maize). Solid biomass (wood) keeps the IPCC median, 230 gCO₂e/kWh: forest wood creates a
carbon debt lasting several decades.
9. Comparison with other 100% renewable scenarios
In short. For solar and onshore wind, our 100% RES fleet is within the range of the major European scenarios.
It differs on three points: more batteries, no hydrogen and more biogas to generate electricity. These differences come mainly from two
choices: the grid between countries stays as it is today, and only electricity is modelled.
Technical explanations
To compare systems of different sizes, capacities are expressed per 1,000 TWh of annual electricity demand. Scenarios that cover all
sectors (heating, transport, industry) count in their demand the electricity used to make hydrogen: their ratios are therefore somewhat
lower than those of a system that models electricity only.
Scenario
Solar
Onshore wind
Offshore wind
Batteries GW / GWh
Hydrogen
Dispatchable bio GW · TWh/yr
ENRgy Maps, 100% RES electricity only, Europe, 3,008 TWh
330
181
16
53 / 504
0
49 · 85
Tröndle et al. 2020, European grid electricity only, 3,181 TWh
78
239
0
17 / 68
8 GW
5 · 10
Tröndle et al. 2020, self-sufficient countries
161
220
0
38 / 150
28 GW
41 · 269
Tröndle et al. 2020, self-sufficient regions
227
190
19
63 / 254
31 GW
58 · 453
PAC 2.0, 2040 (NGOs) all sectors
308
136
37
55 / 334
fuel cells 12.5 GW
0
Neumann et al. 2023 (PyPSA-Eur) all sectors
310 to 418
≈ 200
24 to 28
8 to 32 GW
electrolysis 109 to 145 GW
12 to 25 GW of gas
RTE, Futurs énergétiques M0 (France) all sectors
322
115
96
40 GW
45 GW of plants
—
GW per 1,000 TWh of demand. Values derived by us from the publications; empty cells are not published. ENRgy Maps: campaign 2b (06/11/2026), existing fleet + additions, today's demand; dispatchable bio = gas-fired plants burning biogas and biomass, excluding the 50 GW of backup turbines.
Scenario
Biogas and biomethane available
Gas burnt for electricity
Main back-up when there is neither wind nor sun
ENRgy Maps, 100% RES
338 TWh (cap)
254 TWh of biogas
biogas, batteries
Millinger et al. 2025 (PyPSA-Eur)
637 TWh
225 TWh of methane, for 9,250 TWh of demand
rarely used turbines
TYNDP 2024 (grid operators)
≈ 635 TWh
low
hydrogen, batteries
Agora Energiewende, 2050
196 TWh
13 TWh of electricity
hydrogen plants
PAC 2.0, 2040
marginal
0
hydrogen fuel cells
RTE M0 (France)
—
0
hydrogen
What is comparable
Solar (330 GW per 1,000 TWh) and onshore wind (181) sit within the published ranges. Our biogas cap
(338 TWh) is the same as in the PyPSA-Eur model used by several research teams.
More batteries
About 9 to 10 hours of storage, where other scenarios keep 4 to 6 hours, and much more stored energy for the same
demand (504 GWh per 1,000 TWh, against 68 to 334). Three possible reasons: a provisional, fairly low battery cost, no long-duration hydrogen storage, and a grid between countries
that does not expand.
No hydrogen
All other scenarios use stored hydrogen, even those that model electricity only. Our model could build it, but with no
other use for hydrogen, biogas and batteries come out cheaper.
More biogas for electricity
Scenarios covering the whole economy keep biomethane for industry and heating, and get through windless,
sunless weeks with hydrogen. Our use is an upper bound, consistent with the idea of keeping biogas to fill the gaps of solar and wind.
The role of the grid
In Tröndle et al., moving from a European grid to self-sufficient countries multiplies bioenergy use by 9 to 13
and batteries by 2 to 4. Our fleet, whose grid stays that of 2026, looks like the self-sufficient-countries case: a cautious choice that
probably overestimates storage and biogas needs.
Offshore wind
Lower than in most scenarios (16 GW per 1,000 TWh), probably because of connection costs and a grid that cannot carry more
electricity from the North Sea to consumption areas.
Sources: Tröndle et al., Joule, 2020 (data published on Zenodo); Neumann et al., Joule, 2023; Millinger et al., Nature Energy, 2025;
ENTSO-E and ENTSOG, TYNDP 2024 scenarios; CAN Europe and EEB, PAC 2.0, 2024; Agora Energiewende, EU Gas Exit; RTE, Futurs énergétiques 2050.
10. Sources
In short. Where the data and tools used come from.
Technical details
Daily hour-by-hour simulation: demand from ENTSO-E, Elexon and NESO (Great Britain), ECMWF weather; Natural Earth base map (public domain).
PyPSA-Eur (MIT), technology-data, ERA5 (Copernicus), SARAH-3 (EUMETSAT CM SAF), ENTSO-E Transparency Platform,
ECMWF open data (CC BY 4.0), EU ETS prices (Instrat).
Data on this page: data/simulator/scenarios_cartes.json (computation campaign 2b of 06/11/2026 for today's demand; 2050-demand capacity expansion validated on 07/11/2026), generated from the indicateurs_*.csv files of the OVH runs; backup turbines: data/renfort/*/turbines.csv.
2050 demand: RTE, Futurs énergétiques 2050 (2022), reference trajectory (France); ENTSO-E and ENTSOG, TYNDP 2024, Distributed Energy 2050 scenario (CC BY 4.0: demand, hydrogen, grid and candidate projects); Eurostat, degree-days nrg_chdd_a; ReFuelEU Aviation and FuelEU Maritime; technology-data, 2050 costs; ENGIE, Biogas potential and costs in 2050 (2021). Assumptions: data/demande_future/hypotheses_2050.csv, h2_efuels_2050.csv, prix_h2_efuels_2050.csv, flexibilite_2050.csv; code: pypsa/demande_future.py.