Prices and value

In the simulator, the price in a zone at a given hour is the cost of the last power plant dispatched to serve one more MWh: this is the principle of the European electricity market. What becomes of this price when almost everything is solar, wind and storage, and is it enough to pay for the fleet?

1. On the map

The simulator’s “Simulated price” layer colours each zone by its price, for the chosen hour, day, month or year (demand-weighted average).

Open the price map

2. Why reason in terms of marginal cost?

Marginal cost is the cost of the last megawatt-hour produced at a given moment: the fuel and CO₂ of the last power plant that had to be switched on to meet demand.

It is the rule of the European market. Every hour, power plants are dispatched from the cheapest to the most expensive until demand is covered. All of them are paid the price of the last one dispatched. This is what the simulator does, zone by zone.

It is the right signal for operating the fleet. When the price is zero, there is too much sun or wind: it is time to charge batteries and pump water. When it is high, electricity is scarce: storage is drawn down, power is imported, biogas is burned.

It explains exchanges between countries. Electricity flows from the zone where it costs least to the zone where it costs most, until the lines are saturated. When a line is full, the prices of the two zones diverge.

What it does not tell you. A highly renewable system has many zero-price hours: the marginal price alone is not enough to repay the investments. That is why the simulator also shows the full cost of the fleet, investments included (Observatory page).

Marginal prices by technology

Price at which each technology bids in the daily simulator. The price of a zone is that of the technology serving the last MWh, or that of a neighbour when the link is not full. Fuels in €/MWh thermal, CO₂ in t per MWh thermal at €78.6/t. Source: technology-data v0.15.0 (PyPSA-Eur); biomass: JRC ENSPRESO and Danish Energy Agency; coal: IEA 2025 ARA price (corrected 25/10/2026); nuclear and biogas: project assumptions.

TechnologyStarting costConversion
÷ efficiency + operation
€/MWh
on the map
Solar—token cost0.01
Wind—token cost0.015
Run-of-river——0
Biomasswood €17.3/MWh÷ 0.27 + €670
Nuclear—assumption13
Coal€12.4/MWh
+ CO₂ 0.34 t
÷ 0.36 + €4113
Lignite€7.9/MWh
+ CO₂ 0.41 t
÷ 0.33 + €4124
Gas, combined cycle€42.9/MWh
+ CO₂ 0.20 t
÷ 0.57 + €6109
Gas, turbinesame÷ 0.405 + €6150
Oil€43/MWh
+ CO₂ 0.26 t
÷ 0.35 + €8189
Biogas, combined cycle€100/MWh÷ 0.58172
Biogas, turbine€100/MWh÷ 0.39256
Hydro reservoirswater value1÷ 0.9117 to 126
Pumped hydrowater value1× 0.866 × 0.86679 to 85
Batterieswater value1× 0.96 × 0.9697 to 105
Load shedding——100,0002

1 End-of-day water value: average cost of the fleet's thermal plants, weighted by capacity (€105 to 114/MWh depending on the scenario, assumption). 2 Shedding hour excluded from price averages. Examples: €117 in Norway when links to the continent are full (water value); around €80 in France or northern Italy (pumped hydro).

To go further (price duration curves, captured price by technology, fixed-cost recovery, bills versus cost), a detailed analysis is reserved for subscribers.

For subscribers

3. Scope

Please note: the hourly price shown is not the cost of the system (details on the Method page). It includes generation costs, but not those of electricity transmission and distribution, nor taxes. In France, generation costs account for roughly a third of a household’s final bill. System stabilisation costs are not included. Finally, an hour of shortage (load shedding) is never counted as a price: it is counted separately, in hours.