What does a more renewable Europe cost, and how much CO₂ does it avoid? The simulator's three fleets (today's demand) compared with one another: cost, emissions, composition, and behaviour under the same weather. The fleets sized for 2050 demand are presented separately.

Side-by-side summary

The three published scenarios, with today's demand and 2025 weather. Annualised costs at the average 2026-2028 gas price, including the stress-test backup turbines; as a sensitivity, at the 2025 gas price. Method: published scenarios and stress test.

Annualised cost (€bn/yr)

at the 2026-2028 gas priceat the 2025 gas price

Life-cycle emissions (MtCO₂e/yr)

life cycleof which direct (combustion)

2050 demand, separately

Fleets sized for the electricity demand expected in 2050: about 4,800 TWh a year for the modelled Europe, against 3,008 today, because heating, cars and part of industry switch to electricity. Their costs cannot be compared with the summary above: they serve a much larger demand and include the purchase of imported hydrogen and e-fuels. Method: 2050 horizon.

Scenario, 2050 demandRES shareCost (€bn/yr)Life-cycle CO₂ (MtCO₂e/yr)Direct CO₂ (MtCO₂/yr)Backup turbines (GW)Demand (TWh/yr)Imported H₂ (TWh/yr)Zero load shedding
Loading…
Renewables + current nuclear88% renewable · €428bn/yr (incl. +91.1 GW of backup turbines) · 150 MtCO₂e/yr life-cycle · 575 TWh of nuclear. Stress test in progress no load shedding in 2016-2019 and 2022-2024; 2020 and 2021 (8 hours, 15 and 85 GWh) under additional reinforcement; 2025 being checked.
Renewables + new nuclearSame fleet as above: with 2050 demand too, the model builds no new reactor (same cost, €423bn/yr excluding backup turbines, same nuclear output).
100% renewable, flexible demandComputation in progress capacity expansion in progress

2050 technology costs, stress-test backup turbines included (checked on the ten weather years 2016-2025: at most 0.004 GWh unserved per year). Labelled assumptions: imports of hydrogen (€100/MWh) and e-fuels assumed green, outside the power fleet; smart charging for half of electric vehicles, without resizing for smarter charging; minimum operation of biomass cogeneration measured in 2024-2025 still applied in 2050.

1. Cost and emissions

Each point is a fleet. The further left, the less it emits; the higher up, the more it costs. Emissions cover the whole life cycle: manufacturing, construction and combustion.

Click a point for details.

Current fleet 2025Renewables + current nuclear100% renewable

2. Head to head

Choose two scenarios. The bar runs from the centre towards the scenario with the higher value, and the numerical difference is written on the other side. Green: in favour of scenario 2; brown: against it.

Scenario 1
Scenario 2

3. What each fleet generates

Annual generation by technology (TWh/yr, 2025 weather year). The total length of each bar is the same: it is the demand served, plus curtailment and storage losses.

4. Same weather, several fleets

Stylised charts based on actual weather and demand.

The same day, the same weather and the same demand, simulated hour by hour with each fleet: European generation by technology (GW).

5. All the figures

Click a header to sort.

6. All weather years

The same fleet, sized on 2025 weather, simulated hour by hour over ten years of actual weather (2016 to 2025), without re-sizing it. Does it hold up? Bar height: unserved energy (load shedding); dot: number of hours of supply failure.